介绍: 本工程为供排水工程,其中供水线路全长8.748Km,采用双钢管(D=500mm,δ=8mm);排水线路总长3.253Km,采用球墨铸铁管(D=300mm)。 目 录 一、编制依据·····························1 二、编制原则·····························1 三、工程概况·····························2 四、施工准备·····························2 1、气象、地形和水文地质的调查·····························2 。。。。。。。。。。。。。。。。。 八、附件·····························43 1、机具设备计划表·····························44 2、施工平面布置图·····························45 3、施工进度计划·····························47