介绍: 1、该部位悬挑杆外挤设抛撑,悬挑杆受力可按简支梁考虑 1)、荷载标准值 gk1=0.1248KN/m gk2=0.25KN/m2 gk3=0.14KN/m Qk1取1KN/m2 2)、立杆计算 恒载Ngk1=1+( gk1+ gk3) +n·L·gk2 =13.8(0.1248+0.14)+2×1.5×0.35×(1+0.3)=3.65+1.37=5.02kN 活载:按一层算 1×1=1 KN/m2,单位荷载为1.5×1=1.5 KN,一根立杆1.5/2=0.75KN N轴x=1.2Ngk+1.4gk=1.2×5.02+1.4×0.75=6.02+1.05=7.07 KN 所以该梁局部受力值为7.07KN